Fly-In Data Capture → Australian Analysis → Capacity Outcomes
Engineer-Led. Practical. Here to Support You.
Hamilton By Design Co. is an engineer-led team that wants to support you. We connect Papua New Guinea mine sites with experienced Australian engineers and designers—flying in to collect your engineering data, then analysing it in Australia to develop upgrades that help you extract the most from your opportunity.
Don’t feel isolated because of your remoteness—we’re here to help.
Our role is to stand beside your site teams, capture what really exists, and convert that into practical actions that increase capacity, reliability, and safety.
We adapt our systems to fit yours.
Whatever platforms, standards, and workflows your operation already uses, we structure our deliverables to integrate seamlessly with your established processes.

To Mine Management – This Is About Value
You are responsible for getting maximum performance from existing assets while controlling risk and downtime. Hamilton By Design works directly with management to:
- Identify constraints limiting throughput
- Reduce uncertainty before capital decisions
- Turn real conditions into structured engineering plans
- Deliver upgrades that increase production, not just paperwork
Our focus is outcomes:
Accurate site capture → Australian engineering analysis → measurable capacity improvement.
How We Support Your Operation
1. Fly-In Engineering Data Collection
We mobilise to your PNG site to:
- Capture accurate engineering information across plants, structures, conveyors, tanks, and services
- Verify tie-ins, access constraints, and maintenance issues
- Validate legacy drawings against reality
- Engage with operators to understand bottlenecks and operating challenges
2. Australian Engineering & Design
Back in Australia our team will:
- Structure the site data into design-ready formats that suit your systems
- Analyse structural and mechanical limits
- Develop options to increase process capacity
- Produce constructable drawings and work packs for shutdown execution
- Coordinate with your project teams, fabricators, and contractors
3. Capacity & Reliability Outcomes
Everything is aimed at real improvement:
- Debottlenecking of chutes and conveyors
- Structural upgrades for higher loads
- Safer access and maintenance routes
- Brownfields tie-ins with minimal downtime
- Reduced rework through accurate as-builts
- Practical staging to suit your shutdown strategy
PNG Mines We Can Support
Hamilton By Design can service major operations including:
- Lihir (Niolam) Gold Mine – tanks, structures, plant interfaces
- Porgera Gold Mine – restart and upgrade documentation
- Ok Tedi – remote infrastructure and processing areas
- Hidden Valley – mountainous brownfields upgrades
- Simberi – ROM and conveyor systems
- Kainantu – surface/underground interface zones
Why Work With Us
- Engineer-led team focused on supporting you
- We come to site—no desk assumptions
- Australian engineers with mining exposure
- Deliverables aimed at throughput and reliability
- Understanding of PNG logistics and shutdown pressures
- Independent, practical, constructable solutions
- Flexible approach that adapts to your existing systems

Typical Deliverables
- Registered site data and as-built information
- General arrangement and interface drawings
- Capacity upgrade concepts
- Brownfields modification packages
- Photo-annotated engineering reports
- Shutdown execution and staging plans
Remote Site? You’re Not Alone.
No matter how remote your operation, you don’t have to tackle engineering challenges on your own. Hamilton By Design can be on the ground capturing your plant conditions and in Australia turning that data into actions that increase production.
Let’s Talk About Your Opportunity
If you are responsible for getting more from your mine, we can help you:
- See clearly what exists today
- Plan upgrades with confidence
- Deliver changes that actually lift capacity
Contact Hamilton By Design Co.
- Request a PNG engineering support proposal
- Plan a fly-in site visit
- Discuss shutdown and capacity objectives


